Installation & Commissioning
Vette
Global Services (VGS) provides expert installation and commissioning
services for all Vette equipment as well as ancillary items required
to complete the installation and ensure your equipment’s proper operation.
VGS installation, commissioning, re-commissioning and combined service
offerings are performed by Vette service technicians.
Installation service may include but is not limited to the following:
- Affix Rear Door Heat Exchanger unit(s) to compatible racks per
the site schedule
- Attach quick-coupling hose assemblies to Rear Door Heat Exchanger
unit(s)
- Attach quick-coupling hose assemblies to Coolant Distribution
Unit(s) (CDU) or custom manifolds at supply ends
- Secure hose assemblies to stringer, hanger or floor as specified
in site schedule
- Sub-contract installation and attachment of chilled water feeders
to CDU unit(s)
- Sub-contract electrical installation of CDU unit(s) to building
power system
Commissioning services may include but are not limited to the following:
- Check the state and operation of Rear Door Heat Exchanger units
- Fill CDU unit(s) reservoir with treated water
- Release air from any bleed points as needed
- Check the condition of the system fluid
- Add new, treated make-up fluid to the system to accommodate
for installation losses
- Log the operational characteristics of the CDU unit(s) for
predictive maintenance
- Retrieve and store log and alarm data from any CDU unit(s)
- Upgrade firmware if needed or requested (Clients are given
prior notice)
- Perform any engineering change orders (ECO) on equipment as
needed
- Conduct performance tests on equipment using 'load' equipment
if requested
- Balancing of fluid flow per rack
|
 |
 |